Kitchen and bathroom fit-outs
Renovating?
Call the plumber early.
From freestanding baths to kitchen islands, we provide the rough-ins and final installations a renovation depends on. Getting a plumber involved during planning — not after the tiler has finished — is what prevents the expensive corrections.
What we install
- Bathroom transformations
- Relocating waste points and water lines, freestanding baths, wall-hung vanities, frameless showers.
- Modern kitchen plumbing
- Gas cooktops, dishwasher points, filtered water, undermount sinks.
- Laundry remodelling
- Tapware placement, drainage for washing machines and deep-basin sinks, cabinetry integration.
- Appliance commissioning
- Connected, tested, and compliant with manufacturer warranty terms.
- Drainage optimisation
- Falls and waste runs set correctly before anything is tiled over.
- Compliance certificates
- Documentation that protects the investment and your insurance position.
Project gallery
Recent Ozra project work
A selection of Ozra plumbing installations, fit-outs, and project work across Melbourne.
How it works
How the visit runs
The same shape on every job, emergency or planned.
- 01
Book and dispatch
Contact us 24/7 for a scheduled arrival or an emergency dispatch.
- 02
On-site assessment
We diagnose the issue and explain the best solution in plain terms.
- 03
Upfront quote
You receive a fixed-price estimate with no hidden fees before we start.
- 04
Fix and handover
We complete the work properly and leave the space in order.
Frequently asked questions
Questions we get asked about kitchen & bathroom fit-outs
Have a question that isn’t here? Ozra would rather talk it through than have you guess. Honest answers, transparent pricing, and no pressure.
Contact Ozra PlumbingA: Usually yes — it means relocating the rough-in plumbing beneath the floor or behind the wall. We assess the sub-floor first, because a concrete slab and a timber floor allow very different things.
A: The plumbing component usually takes 2 to 4 days across two stages: rough-in (1–2 days), then final fit-off (1 day).
A: Either. Buy your own fixtures if you have a look in mind, or use our trade-tested brand recommendations.
A: During planning. Rough-in has to happen before tiling, and fit-off after cabinetry — booking late is what pushes a renovation over schedule.
A: A poor installation risks water damage to cabinetry and floorboards, and can void your insurance. A licensed plumber issues the compliance certificate that protects the work.
Request a visit
Book kitchen & bathroom fit-outs
Send the details and Ozra will confirm the next step — with a fixed quote before any work begins.
- Available 24/7 Nights, weekends, public holidays
- VBA licensed Licensed, insured, and guaranteed
- Fixed quote Agreed in full before we start
Other things we handle
- Emergency plumbingRapid-response repairs for burst pipes and urgent leaks.
- Hot water systemsExpert repair, maintenance, and installation of gas, electric, and solar units.
- Leak detectionFind hidden leaks behind walls and underground — without digging first.
- Gas fitting & safetyLicensed gas leak detection, appliance installation, and carbon monoxide testing.